905 King Street West, Toronto, Ontario

Colocation in Toronto: TOR2 Data Center

The 905 King Street facility is a state-of-the-art data center built leveraging standards for concurrent maintainability for space, power, mechanical systems and security.

Enterprise-Grade Annex to Carrier Hotel

Our second Toronto colocation data center can be utilized as a stand-alone, diverse bypass facility to the 151 Front Street data center, or can be leveraged as a natural extension with the diverse fiber ring connecting the two facilities. By linking the two downtown Toronto colocation data centers, you get the benefits of both – unsurpassed levels of security, reliability and connectivity.

TOR2: Technical Specs

Location

Located in downtown Toronto

Convenient transportation options with the 3rd largest transit system in North America

20 minutes from the Toronto Pearson International Airport

UBC Seismic Zone 0

Outside floodplain

Facility

20K SQFT

Custom cabinets and cages including deep 42U cabinets

APC hot aisle containment pods (premium dedicated pod options for 10+ cabinets)

Concrete and steel structure

Customer workspace, conference room and lounge area

Power

150 watts per SQFT

High-density configurations available in excess of 8 kW per cabinet

Customizable power configurations up to 2N uninterruptible power system (UPS) and generator

Multiple backup generators with separate generators supporting the cooling infrastructure

Modular power distribution systems

Diverse automatic transfer switches (ATSs)

Cooling

N+1 high-performance chillers / N+1 cooling tower

APC in-row cooling solutions paired with hot aisle containment systems

Ultrasonic humidification

Security

24/7 onsite security guards in the lobby

2x dual interlocking doors and tailgate-proof mantrap

S2 keycard and biometric access

Closed-circuit television (CCTV) system

Customized security available for dedicated pods or cages

Fire Protection

Cross-zoned VESDA

Dual interlocked pre-action fire suppression

Network

Meet-Me-Room (MMR) within Cologix facility with direct access to building’s MMR

10+ unique network provider PoPs onsite, with access to 150+ unique carriers via a diverse, low-latency path to 151 Front Street West

Diverse building fiber entrance and riser facilities

Network-neutral facility

Connectivity benefits of 151 Front Street with additional ability to access network routes onsite that bypass 151 Front Street to long-haul networks

Support

24/7 access to local engineers and support teams

Access to self-service online customer care portal

All environmental and power monitored 24/7 via Cologix Command DCIM

24x7x365 Network Operations Center (NOC) available by phone or email

Compliance & Certifications

ISO 27001 Certification

ISO 27001 certified by Schellman. Cologix has achieved ISO/IEC 27001:2013 (ISO 27001) certification for its information security management system (ISMS) supporting its Data Center Colocation and Interconnection Services for the specified corporate office and data center facility locations.

Check out our other Toronto Data Centers

Network-Neutral Access to Canada’s Largest Carrier Hotel
151 Front Street West, Toronto, Ontario
State-of-the-Art Expansion in Toronto
905 King Street West, Toronto, Ontario
Scalelogix Connectivity, Interconnection and Scale Near Toronto
105 Clegg Road, Building B, Markham, Ontario
Hyperscale Edge Capacity in Toronto
105 Clegg Road, Markham, Ontario

Cologix operates 40+ data centers across the United States and Canada

Ready to get started?

Take the next step to Cologix Performance, Security and Savings.